Utility interconnection
Regional grid supply under review. SVEC discussions remain preliminary; Dominion feasibility review remains pending.
A proposed next-generation AI and high-performance computing campus, exploring resilient power, intelligent energy management and efficient cooling — one validated step at a time.
PLANNED COMPUTING INFRASTRUCTURE
WHG Data Center is a proposed venture of White Hand Global LLC, building on a background in government and commercial contracting to explore the development of future mission-critical digital infrastructure.
The proposed 26-acre Penn Laird campus is being evaluated as a phased project. Design choices, electrical capacity, infrastructure availability, permitting and capital requirements remain subject to detailed study. The design objective is to align with applicable U.S. federal security and operational requirements for potential agency use, subject to verification and approval.
Architecture-first thinking. Every critical system is being evaluated for compatibility, resilience and operational efficiency.
Regional grid supply under review. SVEC discussions remain preliminary; Dominion feasibility review remains pending.
Studying gas generation and turbine configurations, resilience requirements, black-start strategy and equipment lead times.
Battery energy storage concepts for rapid ride-through, peak support and resilient power operation.
A coordinated protection, distribution and control layer is being evaluated. No final topology has been selected.
Evaluating direct-to-chip and other high-density cooling approaches with energy and water use as key design considerations.
N+1 redundancy is a planning objective for selected critical systems, subject to engineering validation.
☼ Optional future studies: renewable generation and potential grid export, only if technically, commercially and legally feasible.
Conceptual discussion diagram only. Physical power flows, protective equipment and control interfaces require engineering design.
NOT AN ELECTRICAL SINGLE-LINE DIAGRAM · No implied parallel utility operation · All feed capacities and interconnection methods are unconfirmed.
Study-stage capacity references are planning objectives only, not utility-approved availability or a forecast of completed construction.
Assessing technical configuration and initial deployment economics.
Subject to utility agreements, permits, anchor demand, engineering and financing.
Potential longer-term development envelope; not a committed capacity.
WHG is investigating approaches to improve energy used per completed AI computation, including coordinated GPU operation and liquid-cooling controls. Research feasibility, originality and performance improvements have not yet been demonstrated.
THE EFFICIENCY VISION Maximize useful computing delivered for each unit of electricity consumed. This ambition is evaluated scientifically through kWh per completed standardized AI workload, not by equating kilobytes with kilowatts.
Energy per completed AI workload (kWh / standardized work)
Power Usage Effectiveness (PUE), where facility-scale measurement applies
For engineering firms, utilities and potential capital partners. Current discussions are exploratory and do not represent partnership commitments.
Designed as a practical agenda companion for early-stage meetings.
Start a conversation ↗For U.S. firms: professional email, U.S. SMS verification, and company details required before submission. Activation pending.
Business Application ↗02 / GENERAL & INTERNATIONALContact UsFor general questions, introductions, and inquiries from organizations outside the United States.
General Inquiry ↗For engineering, infrastructure, partnership and project-development inquiries, contact the WHG team through the appropriate private channel.
Contact Us ↗Public contact details are intentionally not displayed at this stage.